29 km access road to headrace of Eastmain 1-A Sarcelle-Rupert project
- Construction of 30-km road to headrace, between Lemare River and dikes LR-54 and LR-56
- Construction of permanent 27.8 km access road to headrace between Lemare River and the intersection with the road leading to dikes LR-54 and LR-56
- Construction of permanent 2.3 km road to dikes LR-54 and LR-56, from the junction with the headrace access road to the dikes
- Construction of two temporary bypass roads totalling 2.7 km. Maintenance of entire permanent road during construction period
Highlights
- Access road
- Pristine area (clearing required)
- Work site located far away from service centres
- Hyphenated operations
- Logistics
- Performance-driven context in a tight schedule
Type of project | Localisation |
Energy |
James Bay |
Implementation | Client |
May 2007 to November 2007 | SEBJ |
Project value | work performed by |
$18,000,000 | EMF |