29 km access road to headrace of Eastmain 1-A Sarcelle-Rupert project
  • Construction of 30-km road to headrace, between Lemare River and dikes LR-54 and LR-56
  • Construction of permanent 27.8 km access road to headrace between Lemare River and the intersection with the road leading to dikes LR-54 and LR-56
  • Construction of permanent 2.3 km road to dikes LR-54 and LR-56, from the junction with the headrace access road to the dikes
  • Construction of two temporary bypass roads totalling 2.7 km. Maintenance of entire permanent road during construction period
Highlights
  • Access road
  • Pristine area (clearing required)
  • Work site located far away from service centres
  • Hyphenated operations
  • Logistics
  • Performance-driven context in a tight schedule